Automated & Mechanical Parking Presentation

12/08/2008

Click here to start


Table of Contents

Automated & Mechanical Parking Facilities

Presentation Outline

Automated Parking Overview

Storage Operation

Storage Operation (continued)

Retrieval Operation

Automated Parking Silos

Hi-Rise Stackers/Automated Parking

Rack vs. Pallet Systems

Rack System

Pallet System

Trans-lift vs. Separate Lifts/Shuttles

Advantages of Automated Parking

Advantages of Automated Parking

Advantages of Automated Parking

Disadvantages of Automated Parking

Schematic Design Approach

Vehicle Height Study 1996-2001

Height Accommodation

Vehicle Weight Study 1996-2001

Design Issues – Vehicle Considerations

Self-Park Garage Efficiency

Mechanical-Access Parking Efficiency

Volume Efficiency

Performance Issues

Storage Time = Machine Time + Dwell Time

Service Rate (cont’d)

MultiParker 740

Outbound Service Rates

Service Rate of Transfer Compartment

Access Design Issues

Access Design Example

Lift Locations at B1

San Luis Obispo Option A

San Luis Obispo Option B

San Luis Obispo Option E

San Luis Obispo Option H

Chicago Spire

Any Successful Installations of Mechanical Parking?

Hoboken, NJ Automated Parking Garage

Washington, DC Automated Garage

Chinatown, 123 Baxter St, NY, NY

Construction Cost – Hoboken, NJ

Construction Cost – Bellevue, WA

Annual Operating Cost Per Space

Joint NPA/AMPA Publication

Summary

Stackers

Stackers (continued)

Stacker Design

WMP Stacker

WMP Stacker

Puzzle Parking

Puzzle Parking Design

Puzzle Parking Installation

Puzzle Parking Cost

Elevator Retrofit

1800 Glen Arm Design

Mechanical Parking Summary

Home Page: http://www.ampapark.org

Other information:

This presentation was created by Don Monahan.


Download presentation source

Smart Parking Conference, Silicon Valley Leadership Group